Who actually issues the permit
For unincorporated Hernando County, the permit comes from the county's **Building Division** in Brooksville, and new applications now go through its Tyler online portal. The division sits at 789 Providence Boulevard and, per its own page, runs 7:30 AM to 4:00 PM Monday through Friday, with the lobby closing a half hour earlier. If you have been filing here for years, the change that matters is the one dated 3/3/26: that is when the new portal took over.
Confirm the jurisdiction on the parcel before anyone builds a submittal package. The county covers the unincorporated area, and each city inside the county issues its own permits. Our Hernando County service-area page covers the wider picture; this post is about how the Building Division process itself runs.
How the new portal and the legacy portal split
The county's development services FAQ lays out the sequence: create an account, pick the permit type, complete the application, upload documents, and submit for review. Applications can go in 24/7, and registered users can track status, request inspections, receive notices, and pay fees in the same account.
The old system has not vanished. The Building Division describes a legacy portal for permits submitted before 3/3/26, and says it is for review, status, and inspection scheduling only. Its contractor page warns that new permits submitted through the legacy portal will be denied. So a permit pulled last year and a permit you file this week live in two different places, and a project with both will have you logging into both.
One inconsistency to know about: the division's main page says all new applications must go through the Tyler portal, while its contractor page still mentions paper applications accepted in person or at the lobby drop box. Call (352) 754-4050 before you drive over with a paper set.
What the county will and will not tell you about review time
Hernando publishes no number of days. The FAQ says review times vary with permit type, project complexity, and application completeness, and that correction notices arrive through the portal and/or email. That matches how plan review works across Florida: completeness drives the clock more than the reviewer does.
The practical risk is a correction notice that sits unread. A comment lands on a Tuesday, nobody opens it until the following Monday, and the schedule slips a week that the county never caused. That is the job of permit tracking: someone watching the portal every day, so comments get answered while the reviewer still has your file open.
Inspections: contractors use the portal, everyone else calls
The Building Division states that contractors must schedule every inspection through the portal: log in, find the permit, choose Request Inspection, and pick from the offered types and dates. You can cancel or reschedule there before the scheduled date, and results post to the permit record after the inspector finishes. Owner-builders and homeowners acting as their own contractor may schedule by email at bldg@hernandocounty.us or by phone.
A failed inspection lists its deficiencies in the comments, and those get fixed before a reinspection can be scheduled. For commercial and subdivision work, the county requires a pre-construction meeting, arranged with Planning and Zoning after plan approval. Build that meeting into the schedule rather than discovering it at mobilization.
Private provider in Hernando County
The county runs a private provider program page describing third-party plan review and inspection as an alternative to county services, under F.S. 553.791. Submissions go through the Contractor Portal with Private Provider selected as the document type. If you are new to the concept, start with our glossary entry on private providers.
The county's building fees page lists fee reductions when you use a private provider: 45% for residential review and inspections, 35% for residential inspections only, 55% for commercial review and inspections, and 45% for commercial inspections only.
Before you line up a firm, read the notice on the Building Division page: starting October 1, 2026, ICI/Sjur Solutions/VIP no longer accepts new Private Provider Review contracts in Hernando County, while VIP inspection services remain available through the Building Department. Confirm with the division how that affects your project. Our private provider services are priced flat at $1 per square foot, about $3,000 on a 3,000 sq ft home, and we will tell you plainly whether the route makes sense in this county.
Impact fees changed in December 2024
Per the county's fee page, Ordinance No. 2024-10, adopted July 30, 2024, increased impact fees for building permit applications received on or after December 2, 2024. We are not quoting dollar amounts here because the county publishes its own current schedules and they change. For what the state caps and what a county still sets, see Florida impact fees: what builders pay. On a multi-lot deal, early design choices are the one lever that can move this number, which is where impact fee reduction work earns its keep.
What to settle before you file
Check jurisdiction on the parcel, get the contractor registered in the Tyler portal, decide up front whether you are using the county or a private provider, and assemble the package complete the first time. Our benchmark is about one week from intake to submission, against the one to three months a self-managed package often takes. If you have a Hernando project coming, tell us the scope and timeline and we will tell you what the filing looks like.
Frequently asked questions
- Where do I apply for a building permit in Hernando County?
- New applications go through the county's Tyler online portal, run by the Building Division in Brooksville. Create an account, choose the permit type, upload documents, and submit. Projects inside a city's limits are permitted by that city, so confirm the jurisdiction first.
- Can I still use the old Hernando County permit portal?
- Only for permits submitted before 3/3/26. The county says the legacy portal is for review, status, and inspection scheduling, and that new permits submitted there will be denied.
- Does Hernando County accept private provider plan review?
- Yes. The county's program page describes third-party review and inspection under F.S. 553.791, with published fee reductions of 35% to 55% depending on scope. Check the division's October 1, 2026 notice about provider contracts before you commit.
“Permit-ready in a week instead of a month. David caught two tabulation errors before submission that would have bounced us. Worth every dollar.”— Custom Home Builder, Anna Maria Island