Residential · Every form, every signature, every checkbox.
Required Documents & Filing
Permit applications, subcontractor verification, PP packets, blower-door and floodplain forms, energy calcs, the Notice of Commencement, and elevation certificates — compiled and filed correctly.
Get help with required documents
Tell us about your project — we’ll reply within one business day.
“Permit-ready in a week instead of a month. David caught two tabulation errors before submission that would have bounced us. Worth every dollar.”— Custom Home Builder, Anna Maria Island
What's in a complete Florida permit package
A complete Florida residential permit package is nine or more separate government forms — not one application. Each form asks for specific information, most need a signature, and some need a notary. Miss one and the package doesn't advance, no matter how clean the architectural plans are.
We handle the permit application, subcontractor verification, the PP packet where a private provider is involved, the blower-door form, the floodplain application, and the low/no form, plus any jurisdiction-specific attachment your county requires — auto-filling every repeatable field from a structured client database so owner, contractor, and project information is never retyped, and never typed wrong the second time.
Every document in the package
Nine forms, one filing. Here's what each one does.
- Permit application — The base filing every other form supports and gets attached to.
- Subcontractor verification — Lists each licensed trade — electrical, plumbing, mechanical, roofing — with license number and insurance, confirmed before work begins.
- PP packet — Required when a private provider handles plans review or inspections instead of the county.
- Blower-door form — Confirms the home's air-infiltration rate meets Florida's energy code.
- Floodplain application — Filed alongside the building permit for any property in a mapped flood zone.
- Low/no form — The final form in the standard package; we complete and file it with the rest of the intake.
- Energy calc — Demonstrates the home meets Florida's energy code for insulation, windows, HVAC sizing, and air sealing — see energy calcs explained.
- Notice of Commencement — Recorded with the county clerk on any project over $2,500 in direct contract price; anchors subcontractor lien rights. See what is a Notice of Commencement?
- Elevation certificate — Required in or near a flood zone; certifies finished-floor height against the Base Flood Elevation.
How we compile and file it
The documents don't have to be hard to be a bottleneck — they just have to be missing.
- 1Order energy calcs
Typically a same-day invoice and next-day delivery, ordered early enough to land before the rest of the package is compiled.
- 2Record the Notice of Commencement
Filed at the county clerk; we retrieve the instrument number and add it to the package. See what is a Notice of Commencement?
- 3Prepare the elevation certificate
For flood-zone properties, ordered from a licensed surveyor and checked against the parcel's Base Flood Elevation.
- 4Complete the remaining forms
Subcontractor verification, PP packet, blower-door, and floodplain applications auto-fill from data we already hold.
- 5Route anything needing a physical signature
Notarized documents and any form the jurisdiction won't accept electronically get signed and returned before the file is compiled.
- 6Compile and hand off
The complete package moves into permit management for submission.
A permit package isn't graded on a curve. One missing signature or an unrecorded Notice of Commencement and the file doesn't advance — it doesn't matter that the architectural plans are flawless. That's why every document gets verified before a single file is uploaded, not after a reviewer asks for the one that's missing.
The steps that can't be automated
Some steps in this stack are manual by law, and we don't pretend otherwise. Notarized documents must be physically signed — Florida's jurisdictions generally don't accept electronic notarization for these forms, and some cities require the signature in person. A recorded Notice of Commencement exists only as a barcode sticker on the permit file; there's no purely digital version.
Those are exactly the steps we manage so they never become the thing that holds up your permit — the human parts of an otherwise automated process.
Flood-zone properties need two more documents
Properties in or near a FEMA flood zone add the elevation certificate and the floodplain application to the standard package. Florida's barrier islands — Anna Maria Island, Siesta Key, Longboat Key — are almost entirely mapped flood zone, so for many of our clients these aren't optional extras; they're standard paperwork on nearly every job.
The elevation certificate documents the finished-floor height against the Base Flood Elevation and drives flood-insurance rates for the life of the home. We prepare both as part of this service and verify flood-driven setbacks separately during zoning verification. More detail: elevation certificates & flood zones.
Working alongside






Frequently asked questions
- Why can't notarized documents be done digitally?
- Most Florida jurisdictions don't accept electronic notarization for these forms. They must be physically signed — and in some cities, notarized in person.
- What documents are actually in a Florida permit package?
- Nine or more: the permit application, subcontractor verification, a PP packet where a private provider is involved, the blower-door form, floodplain application, energy calc, Notice of Commencement, elevation certificate on flood-zone properties, and the low/no form. We compile and file all of them.
- When do I need an elevation certificate?
- When the property is in or near a FEMA flood zone — which covers nearly every barrier-island parcel we work on. It certifies the finished-floor height against the Base Flood Elevation and sets your flood-insurance rate.
- How long does it take to get energy calcs back?
- Typically a same-day invoice and next-day delivery. The trick is ordering them at the right point in the process so they're ready when the rest of the package is compiled, not a week after.
- What is a Notice of Commencement and why does it hold up permits?
- A recorded county document required on any project with a direct contract price over $2,500 (Fla. Stat. 713.13). It exists only as a physical barcode sticker on the permit file, which is exactly why an unrecorded NOC is one of the most common reasons an otherwise-ready package stalls.
- Do you handle the subcontractor verification form?
- Yes — we auto-fill it from a structured client database. It confirms every trade touching the job is properly licensed and insured before work begins.
- What happens if a required document is missing when we submit?
- The package gets rejected and restarts the review cycle, even when the plans themselves are flawless. That's why we verify every document is compiled and correct before a single file is uploaded.
Ready to get permit-ready?
Tell us about your project. We reply within one business day — and we’ll tell you straight whether we’re the right fit.