Miami-Dade plans tracking: how to follow your plan review and what to do when it stalls

By David Gizys · Founder & President
Updated October 26, 2026 · 6 min read
Look it up by process number, not permit number
Miami-Dade tracks plan review by process number. Once the county accepts your application and documents, it assigns that number, and you enter it in the Plans Status & Application Submittal Portal to see where review stands. The county's own plan review page says initial reviews run about 24 hours to 10 business days depending on permit type and complexity, and reworks after corrections take a similar stretch. Treat that as a range, not a promise.
The portal tells you where a package sits. It does not chase anyone for you. If a correction comes back on a Tuesday and nobody opens it until the following Monday, the county did not slow you down. The rest of this post is about where that kind of lost week hides.
Check which jurisdiction actually has your plans
Searching a process number in the wrong system is the most common dead end. The City of Miami runs its own tracking, separate from the county's. Its permit status page describes two tools: iBuild, where you search by process number and read status by discipline, and ProjectDox, where review status and reports sit behind a login.
Many other municipalities inside the county run their own building departments too, so a Miami mailing address proves nothing. Confirm the jurisdiction on the parcel before anyone builds a submittal package. For the broader county picture, start with our Miami-Dade County permitting overview.
How a Miami-Dade submittal moves
This sequence follows the county's published description of its process.
- 1Application and documents are accepted
The county assigns your process number. Write it on everything; every later step keys off it.
- 2Upfront fees are paid
Fees go in through the Pay Fees Due section using the process number. Plan review does not start until they are paid.
- 3Departments review at the same time
Reviews run electronically and simultaneously across the departments your permit touches, so the slowest discipline sets the pace.
- 4The county notifies you
You hear back through the contact methods on the application, either approved or needing corrections. A stale email address on the application is a schedule risk.
- 5Corrections go back in
Reworks are reviewed on a timeline similar to the first pass, so every round costs real calendar time.
Who reviews your plans
The county's page names these reviews. Which ones apply depends on the project.
- Building, structural, electrical, mechanical, plumbing. — Residential and commercial building review, with optional structural peer review.
- Zoning plan review. — The county lists zoning plan review as its own step, separate from building review.
- Environmental plan review. — Also listed separately, so expect its own reviewer and its own comments.
- Fire Rescue and Water & Sewer. — Named as separate reviews on the county's page.
- Public Works. — Handled through the Public Works Online Permit System, not the same portal.
The county says plan review begins after upfront fees are paid. It also says in-person paper submittals are converted to electronic format for a fee, which can add review time. If your portal shows nothing moving, check whether fees were paid before you assume a reviewer is sitting on the file.
Where the schedule actually slips
Because disciplines run in parallel, one open comment from one department holds the whole permit. The other reviewers can finish on day three and it does not matter. The fix is to read the comment the day it lands, route it to the architect or engineer who can answer it, and resubmit while the other disciplines are still moving. That is plan review managed as a live process rather than a waiting room.
The preventable comments are the usual ones: a missing digital signature and seal, an incomplete product approval for exterior components (Miami-Dade is where the Notice of Acceptance comes from, so expect reviewers to care), or a zoning sheet that does not match the survey. Our write-up on common permit delays in Florida covers the pattern statewide.
Tracking is not the same as inspections
The county keeps a separate Schedule/Cancel/Track Inspections system for field inspections. Plan review status lives in the plans portal, and inspection status lives in the other one. Builders who watch only the first are surprised on the framing inspection. If you want to take county inspection queues out of the equation, a private provider is the legal route in Florida, and ours is priced flat at $1 per square foot.
Where we fit
Our deepest relationships are on Florida's Gulf Coast, and we say so plainly. What travels is the discipline: we get a package from intake to submission in about a week, then run permit tracking so someone opens every correction the day it lands. We watch the portal so you don't have to. If you have a Miami-Dade package in review and no one is reading the portal, tell us the process number and the scope and we will tell you what we see.
Frequently asked questions
- What is a process number in Miami-Dade?
- It is the number the county assigns once your application and documents are accepted. You use it to pay upfront fees and to check plan review status in the Plans Status & Application Submittal Portal.
- How long does Miami-Dade plan review take?
- The county says initial reviews take about 24 hours to 10 business days depending on permit type and complexity, with reworks taking a similar time. Complex commercial or multi-department permits can run longer, and no one can promise a date.
- Does the Miami-Dade portal show City of Miami permits?
- No. The City of Miami runs its own tracking through iBuild and ProjectDox. Other municipalities in the county may run their own systems as well, so confirm the jurisdiction on the parcel first.
- Can I track inspections in the same place as plan review?
- No. The county describes a separate Schedule/Cancel/Track Inspections system for inspections, distinct from the plans status portal.